Zillmere Multi-Residential Upgrade
Tom Ryan Builders Pty Ltd · QBCC Licence 1311681
Audit Readiness
74%
Current Stage
002 Set Out and Foundations
Nominee
Ryan John McMahon
Stage Workflow
| 001 | Preliminary and General | Approved |
| 002 | Set Out and Foundations | In Progress |
| 003 | Structural Steel | Locked |
| 004 | Sub Floor Framing | Locked |
| 005 | Wall & Roof Framing | Blocked |
| 006 | Exterior Envelope Construction – Flashing | Locked |
| 007 | Joinery Windows and Doors Openings Installation | Locked |
| 008 | Cladding | Locked |
| 009 | Metal Roofing | Locked |
| 010 | Electrical | Locked |
| 011 | Plumbing | Locked |
| 012 | Mechanical | Locked |
| 013 | Passive Fire Installation | Locked |
| 014 | Internal Linings | Locked |
| 015 | Wet Areas | Locked |
| 016 | Kitchen, Vanitys, Robes | Locked |
| 017 | Painting | Locked |
| 018 | External Works | Locked |
| 019 | Final Completion | Locked |
Evidence — Stage 002
- Form 12 – Surveyor Set OutVerified
- Form 12 – Soil Geotech / Soil Bearing CapacityVerified
- Form 12 – Engineering Inspection (Footing, Retaining Walls & Slab)Missing
- Form 43 – Termite Protection InstallationPending Review
- Form Work Engineer – Pre-Pour InspectionMissing