Evidence Library

Project Documents

Zillmere Multi-Residential Upgrade — required documents grouped by stage.

Stage 001Preliminary and General

Document / FormStatusUploaded byDateVerified byAction
Project specific Contract Works & Public Liability InsuranceVerifiedGreg Watson2025-04-02Ryan McMahon
QBCC Home Warranty InsuranceVerifiedGreg Watson2025-04-02Ryan McMahon
QLeave PolicyVerifiedGreg Watson2025-04-03Ryan McMahon
Energy Efficiency ReportVerifiedGreg Watson2025-04-03Ryan McMahon
Form 15 – Engineering DesignVerifiedEngineer2025-04-05Ryan McMahon
Form 15 – Emergency Lighting & Exit Signs DesignVerifiedEngineer2025-04-05Ryan McMahon
Form 15 – Mechanical Services DesignVerifiedEngineer2025-04-05Ryan McMahon
Form 15 – Fire Protection Systems DesignVerifiedEngineer2025-04-05Ryan McMahon
Building Approval Decision NoticeVerifiedCertifier2025-04-08Ryan McMahon
Hydraulics Plumbing Certification Form 1 or Form 4VerifiedPlumber2025-04-09Ryan McMahon
Dial Before You DigVerifiedGreg Watson2025-04-09Ryan McMahon
Health and Safety Site Management PlanVerifiedGreg Watson2025-04-10Ryan McMahon

Stage 002Set Out and Foundations

Document / FormStatusUploaded byDateVerified byAction
Form 12 – Surveyor Set OutVerifiedSurveyor2025-05-01Ryan McMahon
Form 12 – Soil Geotech / Soil Bearing CapacityVerifiedGeotech2025-05-03Ryan McMahon
Form 12 – Engineering Inspection (Footing, Retaining Walls & Slab)Missing
Form 43 – Termite Protection InstallationPending ReviewTermite Co.2025-05-08
Form Work Engineer – Pre-Pour InspectionMissing

Stage 005Wall & Roof Framing

Document / FormStatusUploaded byDateVerified byAction
Form 15 – Frames & Truss Design & FabricationUploadedTruss Co.2025-05-12
Form 43 – Termite Protection InstallationMissing
Form 43 – Timber Walls & Roof Installation CertificationMissing
Form 43 – Commercial Wall Systems (if applicable)Missing