Stage 001Preliminary and General

Approved

Next: Set Out and Foundations (Stage 002) will unlock after approval.

Attention required
Stage Status
Approved
Hold Point Status
Approved
Forms
12/12 collected
QA Checklist
N/A
Open Defects
0

Required Forms

Upload all required forms before checklist submission.

Project specific Contract Works & Public Liability Insurance
Required
Verified
QBCC Home Warranty Insurance
Required
Verified
QLeave Policy
Required
Verified
Energy Efficiency Report
Required
Verified
Form 15 – Engineering Design
Required
Verified
Form 15 – Emergency Lighting & Exit Signs Design
Required
Verified
Form 15 – Mechanical Services Design
Required
Verified
Form 15 – Fire Protection Systems Design
Required
Verified
Building Approval Decision Notice
Required
Verified
Hydraulics Plumbing Certification Form 1 or Form 4
Required
Verified
Dial Before You Dig
Required
Verified
Health and Safety Site Management Plan
Required
Verified

QA Checklist

No QA checklist is required for this stage.

Defects

All defects must be rectified before approval.

No defects recorded for this stage.

Hold Point Approval

This stage cannot be approved until all requirements are met.

Requirements
  • All required forms uploaded12 of 12
  • QA checklist submittedNo
  • No open defects0
Hold Point Approved

Ryan has signed off this stage.

Audit Trail

View full trail
  • Stage 001 Preliminary & General approved.
    Apr 10, 9:00 AM by Ryan McMahon