Stage 001 — Preliminary and General
ApprovedNext: Set Out and Foundations (Stage 002) will unlock after approval.
Stage Status
Approved
Hold Point Status
Approved
Forms
12/12 collected
QA Checklist
N/A
Open Defects
0
Required Forms
Upload all required forms before checklist submission.
Project specific Contract Works & Public Liability Insurance
Required
QBCC Home Warranty Insurance
Required
QLeave Policy
Required
Energy Efficiency Report
Required
Form 15 – Engineering Design
Required
Form 15 – Emergency Lighting & Exit Signs Design
Required
Form 15 – Mechanical Services Design
Required
Form 15 – Fire Protection Systems Design
Required
Building Approval Decision Notice
Required
Hydraulics Plumbing Certification Form 1 or Form 4
Required
Dial Before You Dig
Required
Health and Safety Site Management Plan
Required
QA Checklist
No QA checklist is required for this stage.
Defects
All defects must be rectified before approval.
No defects recorded for this stage.
Hold Point Approval
This stage cannot be approved until all requirements are met.
Requirements
- ✓All required forms uploaded12 of 12
- ✕QA checklist submittedNo
- ✓No open defects0
Hold Point Approved
Ryan has signed off this stage.
Audit Trail
View full trail- Stage 001 Preliminary & General approved.Apr 10, 9:00 AM by Ryan McMahon