Stage 002Set Out and Foundations

In Progress

Next: Structural Steel (Stage 003) will unlock after approval.

Attention required
Stage Status
In Progress
Hold Point Status
Pending
Forms
3/5 collected
QA Checklist
In Progress
Open Defects
2

Required Forms

2 missing

Upload all required forms before checklist submission.

Form 12 – Surveyor Set Out
Required
Verified
Form 12 – Soil Geotech / Soil Bearing Capacity
Required
Verified
Form 12 – Engineering Inspection (Footing, Retaining Walls & Slab)
Required
Missing
Form 43 – Termite Protection Installation
Required
Pending Review
Form Work Engineer – Pre-Pour Inspection
Required
Missing

Concrete Pre-Pour QA Checklist

Complete all checklist items and submit for approval.

Progress0 / 48
StatusIn Progress
Last updatedToday, 10:24 AM

Defects

2 open

All defects must be rectified before approval.

DEF-001
Reinforcement chairs installed / correct cover achieved
Raised from QA Checklist
In Progress
DEF-002
Formwork level, straight and square
Raised from QA Checklist
Open

Hold Point Approval

This stage cannot be approved until all requirements are met.

Requirements
  • All required forms uploaded3 of 5
  • QA checklist submittedNo
  • No open defects2 open
Not Ready for Approval

Complete all requirements to enable approval.

Audit Trail

View full trail
  • Form 43 Termite Protection uploaded — pending review.
    May 8, 2:00 PM by System